Skip to content
AfriScienceGroup home
Drilling and Reservoir Engineering

Drilling Rig Equipment, Inspection and Acceptance

A rig that arrives on contract with a worn crown block, an untested accumulator or an overdue derrick survey can stand idle for weeks while the operator pays mobilisation and the contractor disputes the rate. Rig acceptance exists to catch that before the spud date. Delegates study each system in turn: derrick or mast, drawworks and hoisting line, top drive and rotary, mud pumps and high pressure lines, power generation, pipe handling and the BOP and well control package. For each they learn what to look for, which records to demand and which standards apply, including API RP 4G, Spec 8C, RP 7L and API Standard 53. Slip and cut programmes, dropped object surveys and lifting gear registers are included. Delegates leave able to plan and run a rig audit and close out its findings.

5 day course

Course objectives

  • Describe the function and failure modes of each major rig system
  • Plan a rig acceptance audit scope and schedule
  • Inspect derrick, mast and substructure against API RP 4G practice
  • Assess drawworks, drilling line and slip and cut records
  • Verify mud pump, high pressure line and top drive condition
  • Review BOP and accumulator testing and maintenance records
  • Apply dropped object and lifting equipment controls
  • Grade audit findings and agree a close out plan with the contractor

Who should attend

  • Rig inspection and audit engineers
  • Drilling superintendents and company representatives
  • Rig maintenance supervisors and chief mechanics
  • Drilling contract and asset managers
  • Electrical and mechanical rig superintendents

Course outline

  1. 01Purpose and structure of rig acceptance
  2. 02Derrick, mast and substructure
  3. 03Hoisting system and drilling line
  4. 04Top drive, rotary and pipe handling
  5. 05Mud pumps and high pressure circulating system
  6. 06Power generation and electrical systems
  7. 07BOP, accumulator and choke manifold
  8. 08Dropped objects and lifting equipment
  9. 09Audit reporting and close out

Scheduled sessions

Scheduled sessions for Drilling Rig Equipment, Inspection and Acceptance
DatesVenueFormatPriceRegister
21 to 25 December 2026OnlineOnlineR8,500 per delegate
28 December 2026 to 1 January 2027Johannesburg, South AfricaClassroomR19,950 per delegate
18 to 22 January 2027Cape Town, South AfricaClassroomR19,950 per delegate
15 to 19 March 2027Nairobi, KenyaClassroomUSD 1,325 per delegate

Drilling Rig Equipment, Inspection and Acceptance

From R8,500

Ask